Material Shop Inspection OS
System Online Azure · eastus2
Key Metrics FY 2024 · Updated daily
API Integrations 4 connected endpoints
Inspection Pipeline 318 active
Material Breakdown 1,047 inspections · FY 2024
Recent Lot Activity Last 8 submissions 6 open NCRs
Lot IDMaterial / GradeQty SubmittedInspectorStageResult
NCR Log Non-Conformance Reports
6
Open
26
Closed YTD
32
Total YTD
Platform Issues 4 open · 59 resolved YTD
IDSummarySev.AssignedAge
Issues by Type
Regulatory Compliance 6 standards tracked
Inspector Activity 5 credentialed · FY 2024
Inspections YTD Pass rate %
Monthly Trend
Inspections closed Avg turnaround (days) Issues opened
Document Management Version-controlled · E-signature enabled
Doc IDTypeLot ReferenceMaterial Ver.StatusE-SignatureDate
Work Order Queue Procore-synced · Escalation tracked
SLA & System Health 99.9% contracted · Azure eastus2
Deployment History
API Endpoint Status
Audit Trail Immutable · AASHTO-compliant log
Material Shop Inspection OS · GGB
What is this dashboard?

This system tracks every material inspection for the Golden Gate Bridge — steel, concrete, fasteners, coatings, and more. Use it to monitor quality, catch failures early, and stay compliant with AASHTO and Caltrans standards.

Red = Needs attention
Open NCRs, overdue work orders, and rejected lots are highlighted in red. These need action from an engineer or supervisor.
Green = All clear
Approved documents, passing lots, and compliant standards show in green. No action needed — things are on track.
Use the sidebar to navigate
Each sidebar section covers a different part of the program — inspections, documents, compliance, and system health.
?
Hover underlined terms for help
Technical terms like NCR, EOR, and AASHTO have inline definitions. Press the ? button (bottom-right) for the full glossary.
Quick Reference
Color Guide
Green — Pass / Approved / System healthy / Trend improving
Red — Fail / NCR open / Critical priority / Overdue SLA
Orange — Warning / In Progress / Flagged / Approaching deadline
Teal — Active / In Review / Pending sign-off
Yellow — Under review / Near compliance threshold
Purple — System events / Audit trail actions
Lot Statuses
Closed
Inspection fully complete. All tests passed, records signed off. No further action needed.
QA Sign-off
All tests done — awaiting a final signature from the QA engineer before the lot can close.
In Review
Currently being reviewed by an inspector or lab. No action needed yet — check back later.
Pending Close
A minor outstanding item (usually paperwork) is holding the lot open before final closure.
Flagged
Test results raise a concern. The lot is held until an engineer reviews the data.
Work Order Priorities
Critical
Blocks construction or poses a safety risk. Must be resolved within 24 hours — escalates automatically.
High
Significant issue affecting project schedule. Target resolution: 48 hours.
Medium
Standard follow-up item. Target resolution: 72 hours.
Low
Minor or informational. No urgent deadline.
Inspection Terms
Lot
A batch of material submitted for inspection — e.g., "240 A490 bolts from PO-2847" or "3 concrete cylinders from Nov 6 placement."
NCR — Non-Conformance Report
Filed when a test result falls below the required standard. The lot is placed on hold until the EOR issues a disposition (accept, reject, or repair).
EOR — Engineer of Record
The licensed structural engineer legally responsible for approving or rejecting NCR dispositions on this project.
ITR — Inspection Test Record
A checklist completed during an inspection confirming each required test was performed, witnessed, and recorded.
Mill Certificate
A document from the steel manufacturer certifying the material meets the specified chemical composition and mechanical properties (e.g., yield strength, elongation).
Submittal
A shop drawing, product data sheet, or material sample submitted by the contractor for engineer review and approval before installation.
CVN Test — Charpy V-Notch
Measures how tough steel is at a specific temperature — i.e., its resistance to sudden fracture. Required for bridge steel in seismic zones.
f'c — Concrete Compressive Strength
The target compressive strength of concrete measured in psi. This project requires a minimum of 4,000 psi per ACI 318-19.
A325 / A490 — Fastener Grades
ASTM bolt standards. A325 = standard structural bolts. A490 = high-strength bolts with stricter proof load requirements — used in critical connections.
A572 Gr50 / A36 — Steel Grades
ASTM structural steel grades. A572 Grade 50 has higher yield strength (50 ksi). A36 is standard mild steel (36 ksi). The grade determines which tests are required.
Standards & Systems
AASHTO
American Association of State Highway and Transportation Officials. Sets the national standards for bridge design, construction, and inspection that all federally-funded bridges must follow.
Caltrans
California Department of Transportation. Sets additional state-level requirements for California bridges — often stricter than AASHTO on seismic provisions.
SLA — Service Level Agreement
A contractual promise about system availability. This platform is contracted at 99.9% uptime — meaning less than 8.7 hours of allowed downtime per year.
AutoCAD / ArcGIS / Procore
The three external systems connected to this dashboard. AutoCAD = structural drawings. ArcGIS = spatial/geospatial mapping. Procore = project management (submittals, RFIs, work orders).